close left
right

Download Brochures

brochure
1/2
Brochure - InLine Leach Reactor

Highest recoveries, faster, guaranteed.

brochure
2/2
Brochure - Unique Hardware

Smart technology for step change benefits.

Applicable Minerals

1/3

Free gold is unbound to other materials and is easy to liberate.

2/3

Gold associated with sulphides requires a modified flowsheet.

3/3

Free silver and silver complexes behave unpredictably and contain impurities.

Applicable Processes

1/1

A high cyanide and high oxygen reaction boosts recoveries.

Order Spare Parts

spare parts

Order Online

Visit the Gekko OnLine Spares website

InLine Leach Reactor

Higher Recoveries, Faster, Guaranteed

Maximise Recoveries From Gravity Gold Concentrates

Gekko’s easy-to-use InLine Leach Reactor (ILR) offers superior gold recoveries in a high efficiency, low cost system.

The innovative ‘rolling barrel’ design of the ILR agitates and leaches coarse gold concentrates under intensive cyanide and oxygen conditions.

The ILR is available as a completely automated batch model for processing small volume gravity gold concentrates from batch separators; and, as a continuous model for treating high-throughput gold and complex sulphide concentrates from an InLine Pressure Jig and flotation circuits.

Gekko's ILR is fully optimisable for the best possible mineral recoveries.

Benefits

The ILR improves gold concentrate security by replacing open tabling with an enclosed leach reactor that eliminates manual handling.

Lower operating costs and greater financial returns are achieved via full automation and electronic control of critical leach parameters.

The target recovery of free gold by the ILR is over 98%. Very high recovery rates on complex sulphide-related gold can also be achieved.

The ILR is readily available for shipping and there's no waiting time for installation, improving speed to operation.

Due to the clever low maintenance design of the ILR, machine components operate at low speeds, reducing wear and saving on maintenance costs.

A simple ‘one pump - one drum’ drive design, with no complex reagents, makes the ILR easy to install into grinding circuits.

First developed in 1997, the ILR has provided an alternative from traditional physical separation steps, such as using recovery tables, into a lucrative chemical separation process. The ILR’s innovative design and efficient mineral leaching chemistry is providing cost, production and environment gains to hundreds of operations worldwide.

Greater Productivity and Profits

Fully optimised to mining operations, the ILR boasts consistent free gold recoveries of over 98% as well as superior recoveries of gold from complex sulphide ores. Leaching coarse (>300 micron) gravity concentrates and recycling leach solutions delivers low energy and operating costs. Rapid leach kinetics and an automated system provide fast mineral recoveries. 

In place of open shaking tables that are prone to theft, the enclosed ILR has lockable access points to protect against theft losses and reduce manual handling.

Simple and Safe to Operate

The ILR can be easily retrofitted to any grinding circuit. The modular, small footprint design requires minimal space for integration. The ILR’s chemical handling is automated and important leach parameters are electronically controlled, making operations faster and safer. Tailings generated are smaller and can be coupled with the detoxification of cyanide, which protects the environment. 

How the ILR Works

The automated Batch ILR treats up to 24 tpd of feed containing accumulated gravity or flotation concentrates of fine and coarse gold. Whereas, the Continuous ILR treats continuous feeds of high tonnage and/or low grade concentrates from gold and complex sulphide ores.

Both the Batch and the Continuous ILRs work to chemically leach metal from ore concentrates using the same separation principle. The ILR’s horizontal rolling bottle design keeps particulate matter in suspension and continuously mixes to accelerate a chemical reaction within the solution.

The ILR receives gravity concentrates or flotation concentrates into its enclosed rolling drum. Inside the drum, the ore concentrates mix with a typically strong 1-2% cyanide solution and pure oxygen (in the case of gold extraction), known as intensive leaching. Specialised baffles inside the drum keep solids in constant contact with the chemical solution. The correct combination of chemicals and ore, plus the slow rolling action of the drum, creates a highly efficient leaching reaction.

When leaching is complete, the pregnant metal rich solution is clarified and transferred to a metal extraction circuit. The leftover cyanide solution is recycled and remaining solids are discarded.  

Optimise Your Ore

The flexible ILR is designed to deliver the fastest leach reaction kinetics for many ore types. The ILR accommodates different leach chemistries and reagent regimens.

Because every ore and every plant is different, the best mineral recoveries are obtained when the ILR’s leaching parameters are optimised to the specific mining operation.

Gekko offer in-house laboratory pre-testing for the ILR and recommend laboratory optimisation for every new ILR installation. The laboratory results are directly scalable to the full-size ILR. Gekko guarantee ILR recoveries when Gekko laboratory services conduct the leach testing and optimisation.

Coarse Gold Separation At Bendigo Minings Kangaroo Flat Operation

Technical Papers (3 of 52)

More Technical Papers
technical paper
Technical Paper 048 - Coarse Gold Separation At Bendigo Minings Kangaroo Flat Operation

AusIMM Gravity Gold Conference, Ballarat, Australia. M. Braaksma, P. Gray | 04 September 2010

technical paper
Technical Paper 046 - The Role Of Gravity And Intensive Cyanidation In Processing Preg Robbing Gold Ores

AusIMM Gravity Gold Conference, Ballarat, Australia. N. Katsikaros and P. Davies. | 02 September 2010

technical paper
Technical Paper 043 - New Developments IPJ And ILR Systems

ALTA International Gold Ore Processing Symposium, Perth, Australia. M. Braaksma and T. Bell. | 01 May 2010

From the left: Mick Speed, Gold Room Foreman, Peter Johnston, Manager Metallurgy, Yavuz Atasoy, Senior Development Metallurgist

Case Studies (3 of 14)

More Case Studies
case study
Case Study - St Ives Gold Mine

Gekko recently successfully installed an ILR2000 Batch unit at Goldfields' St Ives Mine in Kambalda, WA, which is one of Australia's largest gold mining operations. | 01 January 2003

case study
Case Study - Jundee

The Gekko InLine Leach Reactor (ILR) at the Jundee site was installed in 2005 by Proteus Enginners and has consistently achieving in excess of 90% recovery with over 95% availability. | 01 September 2007

case study
Case Study - Antapite Mine

Gekko recently installed an ILR1000 Batch unit at the Antapite Mine in Peru. The mine is owned by Inversiones Mineras del Sur S. A of whom Buenaventura have a 72.6% share. | 01 December 2002

Gekko Gravity Box Package for Gold Fields’ Agnew

Articles (3 of 88)

More Articles
article
Gekko Gravity Box Package for Gold Fields’ Agnew

After eight years of reliable ILR success, Gold Fields has upgraded its Agnew ILR2000 Batch Automatic unit. | 01 September 2012

article
Upgrades for Hochschilds’ Ares Plant

Gekko Systems is assisting Hochschild Mining to expand and upgrade their silver concentrate leach plant at Ares mine site in Peru. | 01 September 2012

article
Damang Upgrades ILR to Latest Model

Gekko's InLine Leach Reactor has long been the world's leading intensive cyanidation unit. With over 115 installations world-wide, the ILR is beginning to be a standard inclusion to cyanidation... | 01 October 2013

Mali - MDM Engineering
57
InLine Leach Reactor
26
-26.1168
28.0245

Mali - MDM Engineering

Cresta, South Africa
January 2000

MDM Engineering is a minerals process engineering and project management company, based in South Africa. With a proven track record of over 26 years, a team of skilled professionals with experience in 15 countries around the world, and the support of both strong financiers and shareholders, MDM is well positioned to undertake small, medium and large scale minerals projects on a global basis.

Casablanca - Managem
57
InLine Leach Reactor
26
31.3494
-5.72729

Casablanca - Managem

Casablanca, Morroco
March 2016

Industrial mining oriented, Managem Group Expands for more than 85 years at the Morocco and abroad. Operating in the valorisation of mineral substances, every day Managem demonstrates its expertise in each of its activities.

Chirano - Kinross Gold Corporation
57
InLine Leach Reactor
22
6.46013
-2.31754

Chirano - Kinross Gold Corporation

Bibiani, Ghana
January 2001

Kinross acquired its ownership in the Chirano mine on September 17, 2010 upon completing its acquisition of Red Back Mining Inc.  Chirano is located in southwestern Ghana, approximately 100 kilometres southwest of Kumasi, Ghana's second largest city.  Chirano achieved its first gold pour in October 2005, and consists of 11 deposits: Akwaaba, Suraw, Akoti South, Akoti North, Akoti Extended, Paboase, Tano, Obra South, Obra, Sariehu and Mamnao.

Irkutsk - Irgiredmet JSC
57
InLine Leach Reactor
26
55.7397
37.6214

Irkutsk - Irgiredmet JSC

Irkutsk, Moscow
January 2001

Irgiredmet is an integrated fast-growing engineering centre with an extensive and successful experience in working at hundreds Russian and international deposits of precious, rare and non-ferrous metals and diamonds. Irgiredmet has to its credit dozens of designed, commissioned and renovated plants and facilities; hundreds of published scientific works and introduced inventions.

Halifax - Linear Gold Corporation
57
InLine Leach Reactor
22
44.6509
-63.5774

Halifax - Linear Gold Corporation

Halifxax, Nova Scotia
January 2007

Linear Gold Corp is a publicly-traded company focused on acquiring and exploring properties that demonstrate real potential as hosts of world-class gold deposits.

Casa Beradi - Hecla Greens Creek Mining Company
57
InLine Leach Reactor
26
58.2887
-134.421

Casa Beradi - Hecla Greens Creek Mining Company

Coeur d'Alene, Idaho
January 2001

Casa Berardi mine is situated 95 kilometres north of La Sarre, Quebec and straddles a 37 kilometre section of the Casa Berardi fault.

Welkom - Harmony
57
InLine Leach Reactor
26
-27.7617
26.6404

Welkom - Harmony

Allanridge, South Africa
January 2000

Some 20 kilometres north of Welkom, Target 1 has a single surface shaft system with a sub-shaft and a decline. Two years ago, an acquired asset was incorporated into this operation and named Target 3 shaft. Ore is processed at the Target plant adjacent to 1 shaft. Target plant received integrated ISO 14001, OHSAS 18000 and ISO 9000 certification during the year. Both mechanised and conventional mining occur on the Basal, Elsburg and Dreyerskraal Reefs, with mining operations extending to a depth of some 2 350 metres.

Brickdam - Guyana Geology & Mines Commision
57
InLine Leach Reactor
26
6.8062
-58.1442

Brickdam - Guyana Geology & Mines Commision

Brickdamn, Georgetown
January 2007

The Guyana Geology and Mines Commission (GGMC) was created in 1979 from the Department of Geological Surveys and Mines which itself was the successor to the Geological Survey of British Guiana. Currently GGMC is divided into the following technical divisions: Geological Services, Mines, Environment, Petroleum, Land Management

Granny Smith - Gold Fields
57
InLine Leach Reactor
22
-31.9496
115.842

Granny Smith - Gold Fields

Laverton, WA
March 2015

The Granny Smith Gold Mine (GSM) is owned by GSM Mining Company Pty Ltd a wholly owned subsidiary of Gold Fields Ltd. This entity came into being on 1 October 2013 following Gold Fields’ acquisition of the asset from Barrick Corporation. GSM controls exploration and mineral rights over a total area of 64,267 hectares (total of granted tenements) and has security of tenure for all current exploration and mining leases that contribute to future Mineral Reserves.

Vancouver - Frontier Mining
57
InLine Leach Reactor
62.4527
-114.407

Vancouver - Frontier Mining

Vancouver
January

Eldorado is a global gold mining company with a local operating philosophy. Our success stems from a commitment to asset quality, capital discipline, and responsible operations. We are patient developers, prudent operators and partners in prosperity. Our goal is to build value for all our stakeholders – safely and responsibly.

San Julian - Fresnillo Plc
57
InLine Leach Reactor
26
26.0296
-106.506

San Julian - Fresnillo Plc

Mexico

We’re a leading precious metals group based in Mexico. Our flagship mine has been in operation for almost 500 years. Our people, expertise and strategy for growth will help us succeed for years to come

San Julian - Fresnillo Plc
57
InLine Leach Reactor
26
26.0296
-106.506

San Julian - Fresnillo Plc

Mexico

"We’re a leading precious metals group based in Mexico. Our flagship mine has been in operation for almost 500 years. Our people, expertise and strategy for growth will help us succeed for years to come"

Coolgardie - Focus Operations Pty
57
InLine Leach Reactor
22
-30.707
121.222

Coolgardie - Focus Operations Pty

Coolgardie, NSW
January 2007

Focus is the largest landholder in the Coolgardie Gold belt with over 450sq km of tenements in close proximity to its 3 Mile Hill mill. Open pit and underground. 450 sq km land holding. 35 km West of Kalgoorlie

Makati City - FCF Minerals
57
InLine Leach Reactor
26
16.4126
121.321

Makati City - FCF Minerals

Phillipines

FCF Minerals Corporation (FCF) was incorporated in the Philippines and was duly registered with the Philippine SEC on December 3, 2001 to engage in continuing exploration, development and commercial operation of mineral claims with full power and authority to do any and all acts, things, business and activities which are related, incidental or conducive directly or indirectly to the attainment of the foregoing objectives as a mining company.

Nzema - Endeavour Mining Nzema Gold Operations
57
InLine Leach Reactor
22
4.99809
-2.23984

Nzema - Endeavour Mining Nzema Gold Operations

Accra
April 2010

The Nzema mine is located on the southern end of the Ashanti Gold Belt in south-western Ghana, approximately 280km west of Accra. The mine declared commercial production on April 2011, operating through a series of open pits.

El Aguila - Don David Gold Mexico S.A.
57
InLine Leach Reactor
22
17.0778
-96.7182

El Aguila - Don David Gold Mexico S.A.

El Aguila

El Aguila Plant. Copper Lead and Zinc, with primary grinding and then Cu followed by Pb and Zn flotation

Perth - Dominion Mining Ltd
57
InLine Leach Reactor
26
-31.9505
115.838

Perth - Dominion Mining Ltd

Perth
January 2005

delisted following the merger by scheme of arrangement with Kingsgate Consolidated Limited being effective

Davyhurst - Davyhurst Gold Pty
57
InLine Leach Reactor
22
-30.0527
120.64

Davyhurst - Davyhurst Gold Pty

Davyhurst
January 2007

The Company has a resource base of more than 4.6 million ounces, two state-of-the-art gold treatment plants (Davyhurst and Mt Magnet), and has dominant ground positions in the prolific gold mining region to the north-west of Kalgoorlie.

Monarch now has the largest Australian-controlled ground position in the Kalgoorlie region and an expanded footprint in the Mount Magnet region.

Argentina - Compania Minera Ares
57
InLine Leach Reactor
26
-15.1358
-71.7188

Argentina - Compania Minera Ares

Argentina
January 2007

1,750 km South-Southwest of Buenos Aires and the property covers a total area of 50,491 hectares. The San Jose property is located approximately 20 km north of Gold Corps Cerro Negro Project. Mine life 12.2 years

Perth - Cleveland Mining Company
57
InLine Leach Reactor
-31.911
115.812

Perth - Cleveland Mining Company

Perth, Australia

Cleveland Mining Company Ltd is an Australian managed, ASX listed minerals company squarely focused on developing projects into mines.

The company’s management team have a track record for building successful projects from the ground up, providing Cleveland with the expertise to secure and build robust projects.

Perth - Cleveland Mining Company Ltd
57
InLine Leach Reactor
26
-31.911
115.812

Perth - Cleveland Mining Company Ltd

Perth

Cleveland Mining Company Ltd is an Australian managed, ASX listed minerals company squarely focused on developing projects into mines.

The company’s management team have a track record for building successful projects from the ground up, providing Cleveland with the expertise to secure and build robust projects

DaNang - Bongmieu Gold Mining Company
57
InLine Leach Reactor
22
15.5435
108.469

DaNang - Bongmieu Gold Mining Company

DaNang, Vietnam
January 2000
Accra - Bogoso Gold Mine
57
InLine Leach Reactor
22
5.53449
-2.05067

Accra - Bogoso Gold Mine

Bogoso
January 2000

Golden Star is an established gold mining company with producing assets and development projects in western Ghana. Listed on both the NYSE and the TSX, Golden Star holds a 90% interest in the Wassa and Prestea mines, situated on the prolific Ashanti Gold Belt. In 2014, Golden Star produced 261,000 ounces of gold. Golden Star is strategically focused on increasing operating margins with the development of high grade underground mines beneath existing open pit operations at both mines. These underground mines are expected be in production by 2016 for a total capital cost of approximately $80 million

Vancouver - Barrick
57
InLine Leach Reactor
22

Vancouver - Barrick

Vancouver
Hemlo produced 206,000 ounces of gold in 2014 at all-in sustaining costs of $1,059 per ounce1. Hemlo’s proven and probable mineral reserves as at December 31, 2014, were 820,000 ounces of gold.

Barrick’s 2015 full year gold production guidance is 6.0-6.15 million ounces, at all-in sustaining costs of $830-$870 per ounce, from a portfolio that includes some of the world’s premier gold assets.

San Jose - Hochschild PLC
57
InLine Leach Reactor
23
-15.1358
-71.7188

San Jose - Hochschild PLC

Argentina
January 2007

The San Jose silver-gold mine is located in Argentina, in the Santa Cruz province, 1,750 kilometres south-southwest of Buenos Aires. The property covers a total area of 50,491 hectares and consists of 46 contiguous mining concessions totalling 40,499 hectares and an exploration permit covering almost 10,000 hectares. The San Jose property is located approximately 20 kilometres north of Goldcorp’s Cerro Negro project.

EQUIPMENT

InLine Leach Reactor

MINERALS

Complex Gold and Silver

Hera - Aurelia Metals
57
InLine Leach Reactor
22
-31.66
146.02

Hera - Aurelia Metals

Australia
March 2013

Located 100kms SE of Cobar. Large scale, long life mining operation. Commenced full scale development of the Hera Project in March 2013.

EQUIPMENT

InLine Leach Reactor

MINERALS

Gold, Silver, Copper, Lead, Zinc

Ashanti Goldfields - AngloGold
57
InLine Leach Reactor
22
-26.2026
28.034

Ashanti Goldfields - AngloGold

South Africa

Headquartered in Johannesburg, South Africa, AngloGold Ashanti has 20 gold mining operations in 10 countries, as well as several exploration programmes in both the established and new gold producing regions of the world

EQUIPMENT

InLine Leach Reactor

MINERALS

Gold

Nzema - Endeavour Mining
57
InLine Leach Reactor
22
4.99809
-2.24984

Nzema - Endeavour Mining

Ghana

The Nzema mine is located on the southern end of the Ashanti Gold Belt in south-western Ghana, approximately 280km west of Accra. The mine declared commercial production on April 2011, operating through a series of open pits.

Agbaou Gold operations
57
InLine Leach Reactor
23
5.3
-4
Ma'aden, Ad Duwayhi
57
InLine Leach Reactor
23
23.236
42.7698

Ma'aden, Ad Duwayhi

Saudi Arabia

September 2013

The Ad'Duwayhi Gold Project is located approximately 450 km SW of Riyadh, 450 km E/NE of Jeddah and 125 km SE of the town of Zalim. The prospect occupies approximately 1 km2 and consists in plan of a circular, sand wash-covered area partially surrounded by a number of hills rising some 50 m above the central basin floor between 950 and 970 m above sea level.

EQUIPMENT

1 Inline Leach Reactor
ILR2000BA

MINERAL

Gold

SMT, ​​Red Rock​
57
InLine Leach Reactor
23
12.4217
28.1799

SMT, ​​Red Rock​

Sudan
January 2003

Red Rock Company is one of the leading companies in the field of exploration for minerals in Sudan. In 2012, the company established a special drilling department including 2 diamond core drilling machines having high specifications and great potentials reaching up to a depth of 1125 meters according to NQ standard; and reaching more than 600 meters according to HQ standard

EQUIPMENT

InLine Leach Reactor
ILR1000BA

MINERAL

Gold

Serra Pelada - Colossus Minerals
57
InLine Leach Reactor
23
-5.96845
-49.6

Serra Pelada - Colossus Minerals

Brazil

The Serra Pelada mine is situated in the Carajas region, near the towns of Curionopolis and Parauapebas, in the Para region of northern Brazil, where access and infrastructure are excellent. Located on a 874 hectare property, it is currently in its advanced development stage.

EQUIPMENT

2 x InLine Leach Reactor ILR150BA

MINERALS

Gold, Platinum, Palladium

Lefa - Crew Gold
57
InLine Leach Reactor
23
11.7381
-10.1

Lefa - Crew Gold

Guinea
January 2001

The Lefa gold mine is located in northern Guinea, 700km northeast of Conakry. Operation of the open-pit mine is conducted by Crew Gold, with production being commenced at the site in 2008.

EQUIPMENT

InLine Leach Reactor ILR2000BA

MINERALS

Gold

PRODUCTION

196Koz of gold during 2011

Marlin - Goldcorp
57
InLine Leach Reactor
23
15.233
-91.6921

Marlin - Goldcorp

Guatemala
January 2004

The Marlin mine is located in the San Miguel Ixtahuacan municipality, 25km south west of Huehuetenango and 300kkm northwest of Guatemala City. It utilises both open-pit and underground mining, with processing achieved via crushing, grinding and cyanide milling. The estimated mine life is 5 years.

EQUIPMENT

InLine Leach Reactor ILR1000BA

MINERALS

Gold

PROCESSING

6,000 tonnes per day capacity

PRODUCTION

185,000-200,000 ounces of gold for 2013

Davyhurst - Swan Gold
57
InLine Leach Reactor
23
-30.0527
120.64

Davyhurst - Swan Gold

Australia
January 2007

Davyhurst is an open cut mining operation located 120km northwest of Kalgoorlie, Western Australia. In addition to the existing mining operation, there remains considerable potential for the discovery of new gold deposits in the area.

EQUIPMENT

InLine Leach Reactor ILR150BA

MINERALS

Gold

PRODUCTION

152,690 ounces of gold produced between 2000-08

Chatree - Kingsgate
57
InLine Leach Reactor
23
16.3775
100.309

Chatree - Kingsgate

Thailand
January 2004

The Chatree gold mine is located 280km north of Bangkok in Thailand's Phichit Province. Chatree commenced operations in November 2001, becoming Thailand's first modern gold mine. The mine is open-pit, with operations being conducted by Akara Mining.

EQUIPMENT

InLine Leach Reactor 1000BA

MINERALS

Gold

PRODUCTION

Between 74,000 and 154,000 ounces of gold per year since 2001.

Tabakoto - Endeavour Mining
57
InLine Leach Reactor
23
12.945
-11.1953

Tabakoto - Endeavour Mining

Mali

The Tabakoto mine property is located 360km west of Bamako in southwestern Mali near the border with Senegal. Operation occurs from one open-pit and an underground mine, commencing in early 2012.

EQUIPMENT

InLine Leach Reactor ILR2000BA

MINERALS

Gold

PRODUCTION

150,000 ounces of gold per year

Kodieran - Pearl Gold
57
InLine Leach Reactor
23
12.2897
-7.5

Kodieran - Pearl Gold

Mali
November 2007

Pearl Gold holds a first participation in the Malian mining company Wassoul’Or S.A, which concentrates on the exploration and production of gold and runs the Kodieran gold mine 300 km southeast of Bamako.

EQUIPMENT

InLine Leach Reactor ILR5000BA

MINERALS

Gold

PRODUCTION

11,000 tonnes per day

Geita - AngloGold Ashanti
57
InLine Leach Reactor
23
-2.87566
32.173

Geita - AngloGold Ashanti

Tanzania
January 2000

The Geita gold mine is located in the Lake Victoria goldfields of the Mwanza region of Tanzania, about 120km from Mwanza and 4km west of the town of Geita. It is a multiple open pit operation with underground potential and is serviced by a CIL processing plant.

EQUIPMENT

InLine Leach Reactor ILR1000AC

MINERALS

Gold

PRODUCTION

357,000 ounces of gold produced for 2009

Cerro Vanguardia - AngloGold Ashanti
57
InLine Leach Reactor
23
-48.393
-68.2649

Cerro Vanguardia - AngloGold Ashanti

Argentina
January 2001

The Cerro Vanguardia mine is located northwest of Puerto San Julian in the province of Santa Cruz. Its operation consists of multiple small open pits with ore being processed at the on-site metallurgical plant.

EQUIPMENT

InLine Leach Reactor ILR100CA

MINERALS

Gold

PROCESSING

2,800 tonnes per day.

PRODUCTION

192,000 ounces produced 2009

Freda Rebecca - Mwana Africa
57
InLine Leach Reactor
23
-17.2961
31.3

Freda Rebecca - Mwana Africa

Zimbabwe
January 2001

The Freda Rebecca gold mine is located 90km north east of Harare, Zimbabwe. It began operation in 1988 and consists of a shallow underground mine.

EQUIPMENT

InLine Leach Reactor ILR1000BM

MINERALS

Gold

Inata - Avocet
57
InLine Leach Reactor
23
14.3013
-1.16335

Inata - Avocet

Burkino Faso
April 2008

The Inata gold mine is located in the Belahouro district approximately 220km northeast of Ouagadougou. The mine was commission in June 2009 with the first gold poured in December of that year. It is comprised of six open pits, with further exploration occurring in surrounding areas.

EQUIPMENT

InLine Leach Reactor 1000BA

MINERALS

Gold

PRODUCTION

135,000 ounces of Golod in 2012

Consolidated Murchinson - Village Main Reef
57
InLine Leach Reactor
23
-23.9653
30.6419

Consolidated Murchinson - Village Main Reef

South Africa
January 2006

The Consolidated Murchinson mine is situated in the Murchinson greenstone belt near Gravelotte, in the Limpopo province. It is an underground mine which has been in operation for nearly 70 years. Village Main Reef acquired 74% of the mine in March 2011 (previously operated by Metrorex).

EQUIPMENT

InLine Leach Reactor 3000BA

MINERALS

Gold, Antimony

PRODUCTION

For 2009: 423kg of gold, 257, 983mtu of antimony.

Nzema - Endeavour Mining
57
InLine Leach Reactor
23
4.99809
-2.23984

Nzema - Endeavour Mining

Ghana
April 2010

The Nzema mine is located on the southern end of the Ashanti Gold Belt in south-western Ghana, approximately 280km west of Accra. The mine declared commercial production on April 2011, operating through a series of open pits.

EQUIPMENT

InLine Leach Reactor 150BA

MINERALS

Gold

PROCESSING

Ranges from 1.6-2.1 million tonnes per annum.

PRODUCTION

109,447 oz of gold for 2012.

Damang - Gold Fields
57
InLine Leach Reactor
23
5.51698
-1.84064

Damang - Gold Fields

Ghana
January 1999

The Damang mine is located in south-western Ghana near the southern end of the Tarkwa basin, 300km west of Accra. It consists of an open-pit mine and an onsite processing facility. The mine's life expectancy has been extended until 2028.

EQUIPMENT

2 x InLine Leach Reactor ILR2000AC & ILR3000BA

MINERALS

Gold

PROCESSING

4,942 kt for 2011

PRODUCTION

218koz of gold during 2011

Ban Houayxai - Panaust
57
InLine Leach Reactor
23
18.9823
102.614

Ban Houayxai - Panaust

Laos

The Ban Houayxi operation is located 32km northeast of Vang-Vieng in the Vientiane district in Laos. The project comprises an open-pit mine and a conventional 4 CIL processing plant. Production at the site commenced in April 2012.

EQUIPMENT

InLine Leach Reactor ILR150BA

MINERALS

Gold

PROCESSING

1.2 million tonnes processed for the September 2012 quarter.

PRODUCTION

September 2013 quarterly production was 26,764 ounces gold, 152,831 ounces of silver.

Philsaga - Medusa Mining
57
InLine Leach Reactor
23
8.19586
126.068

Philsaga - Medusa Mining

Phillipines

The Co-O underground mine is located in Central Eastern Mindanao, approximately 3hrs drive north of Davao City. It's CIP processing plant was built in 1988 and is situated approximately 12km north of the mine site.

EQUIPMENT

InLine Leach Reactor ILR150BA

MINERALS

Gold

PROCESSING

309,648 tonnes for the 2013 financial year.

PRODUCTION

62,243 ounces of gold during the 2013 financial year.

Caijiaying - Griffin Mining
57
InLine Leach Reactor
31
41.7
115.6

Caijiaying - Griffin Mining

China
March 2009

The Caijiaying mine is located in the Hebei province of China, 250km northwest of Beijing. The mine was successfully comissioned in 2005 and is an underground operation.

EQUIPMENT

InLine Leach Reactor

MINERALS

Zinc, Gold, Silver, Lead

PROCESSING

800,288 tonnes for 2013

PRODUCTION

During 2012: 40,581 tonnes zinc, 2,402 tonnes lead, 409,596 ounces silver, 8,322 ounces gold

Duketon - Regis Resources
57
InLine Leach Reactor
23
-28.7671
122.069

Duketon - Regis Resources

Australia
December 2009

The Duketon Gold Project is located in the Laverton region 350km northeast of Kalgoorlie in Western Australia, covering an area greater than 2,000km². This area contains the Moolart Well and the Garden Well gold mines, both open-pit operations.

EQUIPMENT

InLine Leach Reactor ILR150BA

MINERALS

Gold

Telfer - Newcrest
57
InLine Leach Reactor
23
-21.7256
122.202

Telfer - Newcrest

Australia
January 2001

The Telfer mine is located in the East Pilbara region of Western Australia, 400km southeast of Port Hedland. It consists of two open pits and an underground mine. After a period of closure beginning in 2000, operations were recommenced at the site in 2004.

EQUIPMENT

2 x InLine Leach Reactor ILR4000BA

MINERALS

Gold, Copper

PRODUCTION

525,500 ounces of gold and 26,453 tonnes of copper for the 2013 financial year

Thunderbox - Norilsk Nickel
57
InLine Leach Reactor
23
-28.4
120.9

Thunderbox - Norilsk Nickel

Australia
January 2002

The Thunderbox gold mine is located in Western Australia, 41km southeast of Leinster. Norilsk aquired the mine in June 2007 when it took over Lionore Mining. Thunderbox has been in care and maintenance since 2007.

EQUIPMENT

InLine Leach Reactor100BM

MINERALS

Gold

Penjom - J Resources
57
InLine Leach Reactor
23
4.14017
101.8

Penjom - J Resources

Malaysia
January 1996

The Penjom mine is located 120km north of Kuala Lumpur, in the Pahang district of Malaysia. Operations are conducted through an open-pit mine and RIL and gravity separation processing. The mine has an expected life of 6 years, ending 2017.

EQUIPMENT

InLine Leach Reactor ILR1000CA

MINERALS

Gold

PRODUCTION

54,108 ounces of gold during 2011

Pongkor - ANTAM
57
InLine Leach Reactor
23
-6.64546
106.6

Pongkor - ANTAM

Indonesia
January 2007

The Pongkor mine is located on West Java, 100km southwest of Jakarta. It consists of 3 primary veins of gold. It is an underground gold mine and production commenced at the site in May 1994.

EQUIPMENT

InLine Leach Reactor ILR150BA

MINERALS

Gold

Mulatos - Alamos Gold
57
InLine Leach Reactor
23
28.7
-108.8

Mulatos - Alamos Gold

Mexico
November 2011

The mine is located in the Sierra Madre Occidental mountain range, 220km east of Hermosillo and 300km south of the border between the USA and Mexico. Construction on the site began in 2004 with commercial production startin gin April 2006. It operates via conventional open-pit methods with the addition of underground mining commencing in 2014.

EQUIPMENT

2 x InLine Leach Reactor ILR5000BA

MINERALS

Gold

PROCESSING

17,500 tonnes per day

PRODUCTION

200,000 ounces of gold during 2012

Pogo - Sumitomo Metal Mining
57
InLine Leach Reactor
23
64.4459
-144.94

Pogo - Sumitomo Metal Mining

USA
January 2004

The Pogo mine is located alongside the Goodpaster River, approximately 137km southeast of Fairbanks, Alaska. Beginning production in 2006, it is an underground operation with a projected mine life of ten years.

EQUIPMENT

InLine Leach Reactor ILR2000BA

MINERALS

Gold

PROCESSING

2,500 tonnes per day

PRODUCTION

1,000 ounces of gold per day

Detour Lake - Detour Gold
57
InLine Leach Reactor
23
49.9995
-79.6915

Detour Lake - Detour Gold

Canada

The Detour Lake mine is located 185km northeast from Cochrane in Ontario, Canada. Detour Gold Corp started gold production at the site in February 2013. The mine consists of an open pit operation with a significant exploration program in the surrounding area.

EQUIPMENT

InLine Leach Reactor ILR4000BA

MINERALS

Gold

PROCESSING

53,821 tonnes per day

PRODUCTION

75,672 ounces of gold for the quarter ending 30 September

Esmeralda - Great Basin Gold
57
InLine Leach Reactor
23
38.7
-119.3

Esmeralda - Great Basin Gold

USA
January 2010

Great Basin Gold's Nevada operations consist of the Hollister Property in the northern Carlin Trend belt and the Esmeralda Property in the south-west close to the border between Nevada and California. The Esmeralda processing plant is located approximately 467km from Hollister, with ore transported to the site via truck.

EQUIPMENT

InLine Leach Reactor ILR5000CA

MINERALS

Gold

Meadowbank - Agnico Eagle
57
InLine Leach Reactor
22
64.9049
-96.0974

Meadowbank - Agnico Eagle

Canada
April 2008

The Meadowbank mine is located in the Kivalliq region of Nunavut, about 2,600 km northwest of Toronto and 110 km north of Baker Lake. Meadowbank conducts surface mining from a series of three pits and the first gold production from the Portage open-pit began in early 2010 The on-site processing plant uses technology which has been adjusted to the Arctic climate.

EQUIPMENT

InLine Leach Reactor ILR3000BA

MINERALS

Gold, Silver

PROCESSING

Plant capacity is 11,000 tonne/day

PRODUCTION

366,030 ounces of gold DURIN 2012

Hidden Valley - Newcrest
57
InLine Leach Reactor
23
-7.37404
146.665

Hidden Valley - Newcrest

Papua New Guinea
January 2007

The Hidden Valley mine is located in the Morobe province in Papau New Guinea, 300km northwest of Port Moresby and 90km southwest of Lae. Construction of the open-pit mine began in 2007 and commercial production commenced in September 2010.

EQUIPMENT

InLine Leach Reactor ILR1000BA

MINERALS

Gold

PRODUCTION

170,008 ounces gold and 1,712,656 ounces of silver for the financial year ending June 2013

Bong Mieu - Besra Gold
57
InLine Leach Reactor
23
15.6
108.4

Bong Mieu - Besra Gold

Vietnam
January 2000

The Bong Mieu mine is located in the Quang Nam provence of Vietnam, 20km southwest of Tam Ky. Commissioned in 2006, Bong Mieu consists of an open-pit operation with a CIL processing plant.

EQUIPMENT

InLine Leach Reactor ILR5000CA

MINERALS

Gold, Fluorite, Tungsten

Tanami - Newmont
57
InLine Leach Reactor
23
-19.9775
129.8

Tanami - Newmont

Australia
January 2005

Newmont’s Tanami Operations is located on Aboriginal freehold land in the remote Tanami Desert of the Northern Territory, 550km northwest of Alice Springs. Production is from the Callie underground operation and processing occurs at Granites Mill.

EQUIPMENT

InLine Leach Reactor 100BM

MINERALS

Gold

PROCESSING

Capacity to process approximately 2.5 million tonnes per year

Jundee - Newmont
57
InLine Leach Reactor
23
-26.3668
120.603

Jundee - Newmont

Australia
January 2004

The Jundee mine is located in the Yandal goldfields, 45km NE from Wiluna. Production began in 1995 from a complex of open pits and two underground mines.

EQUIPMENT

InLine Leach Reactor ILR1000BA

MINERALS

Gold

PRODUCTION

335,153 ounces of gold for 2010

Gosowong - Newcrest
57
InLine Leach Reactor
23
1.14301
127.7

Gosowong - Newcrest

Indonesia
September 2009

Gosowong is located on Halmahera Island, in the North Maluku Province of the Republic of Indonesia, 2,450km northeast of Jakarta. The project currently consists of four areas of operation, including both open and underground operations.

EQUIPMENT

2 x InLine Leach Reactor ILR1000BA

MINERALS

Gold, Silver

PROCESSING

Capacity to process up to 800,000 tonnes per year

PRODUCTION

312,711 ounces of gold, 342,835 ounces of silver for the year ending June 2015

Siguiri - AngloGold Ashanti
57
InLine Leach Reactor
23
11.4164
-9.18337

Siguiri - AngloGold Ashanti

Guinea
January 2001

The Siguiri mine is located in the relatively remote district of Siguiri, in Kankan, around 850km northeast of the Guinea's capital Conakry. Convential mining is undertaken by contractors in multiple open-pits.

EQUIPMENT

InLine Leach Reactor ILR 1000BA

MINERALS

Gold

PROCESSING

30,000 tonnes per day

PRODUCTION

247,000 ounces of gold for 2012

Bronzewing - Navigator Resources
57
InLine Leach Reactor
23
-27.3814
121.01

Bronzewing - Navigator Resources

Western Australia
January 2007

The Bronzewing Gold Project is located in the Eastern Goldfields of Western Australia, 83km NE of the town of Leinster and 800km NE of Perth. Navigator Resources completed its purchase of the project in September 2009 and the first gold was poured in April 2010. The site has both open-pit and underground operations.

EQUIPMENT

InLine Leach Reactor ILR150BA

MINERALS

Gold

PROCESSING

Scheduled 9.27million tonnes over 5 years from June 2010

PRODUCTION

Scheduled 490,000oz of gold over 5 years from June 2010

St Ives - Gold Fields
57
InLine Leach Reactor
23
-31.2766
121.7

St Ives - Gold Fields

Australia
January 2001

The St Ives mine is located in Western Australia, 19km southeast of Kamblada and 80km south of Kalgoorlie. Its operations are conducted through several open-pits and four underground mines, with a CIP processing plant.

EQUIPMENT

InLine Leach Reactor 3000BA

MINERALS

Gold

PROCESSING

7,038kt for 2012

PRODUCTION

450koz of gold during 2012

Agnew - Gold Fields
57
InLine Leach Reactor
23
-28.0023
120.6

Agnew - Gold Fields

Australia
January 2002

The Agnew mine is located 25 km southwest and 375km north of Kalgoorlie in Western Australia. It is comprised of both open pit and underground operations with a processing plant also on site.

EQUIPMENT

2 x InLine Leach Reactor ILR100BA & ILR2000BA

PROCESSING

943 kt for 2012

PRODUCTION

177koz of gold during 2012

Yanacocha - Newmont
57
InLine Leach Reactor
23
-6.98112
-78.5036

Yanacocha - Newmont

Peru
January 2001

The Yanacocha mine is located 30 km north of Cajamarca. It is considered to be the second largest gold mine in the world, producing over US$7 billion worth of gold to date.

EQUIPMENT

InLine Leach Reactor ILR3000BA

MINERALS

Gold

PROCESSING

600,000 tonnes per day

PRODUCTION

1.3 million ounces of gold during 2011

Ares - Hochschild PLC
57
InLine Leach Reactor
23
-15.1358
-71.7188

Ares - Hochschild PLC

Peru
January 2007

The Ares mine is located 275 km from city of Arequipa in southern Peru at an altitude of 4900 metres above sea level. The site operates an underground mine and a processing plant.

EQUIPMENT

5 x InLine Leach Reactor ILR5000BM

MINERALS

Gold, Silver

PROCESSING

336,423 tonnes in 2012

PRODUCTION

26.28koz of gold 2012, 481 koz of silver and 2,058koz of silver equivalent.

Antapite - Buenaventura
57
InLine Leach Reactor
23
-12.951
-75.1794

Antapite - Buenaventura

Peru
January 2001

The Antapite mine is located in the provence Huancavelica, 434 km southeast from city of Lima at an altitude of approximately 3,350 metres above sea level. It consists of an underground mine.

EQUIPMENT

InLine Leach Reactor ILR1000BM

MINERALS

Gold, Silver

PROCESSING

155,842 tonnes in 2011

PRODUCTION

28,588 ounces of gold for 2011

Arcata - Hochschild PLC
57
InLine Leach Reactor
23
-15.1358
-72.1033

Arcata - Hochschild PLC

Peru
January 2007

The Arcata mine is located in the Department of Arequipa in Southern Peru, approximately 300 km from the city of Aerquipa. It is a 47,000 hectare site, at an altitude of 4,600 metres above sea level. The mine is an underground operation which has been producing silver and gold since 1964.

EQUIPMENT

InLine Leach Reactor Mini

MINERALS

Gold, Silver

PROCESSING

1,750 tonnes per day

PRODUCTION

17.27 koz of gold and 6,562 koz of silver during 2012

Peak Mines - New Gold
57
InLine Leach Reactor
23
-31.5406
145.86

Peak Mines - New Gold

Australia
May 2007

The Peak mines are located in the Cobar Gold Field of Central-West NSW, 600km North-West of Sydney and 8 km South of Cobar. The mines were opened in 1992 and consist of 5 commercially active mines and a copper-gold processing plant. Produces gold dore for sale at the Perth mint and copper concentrate which is sold to Markets in Asia.

EQUIPMENT

InLine Leach Reactor 2000BA

MINERALS

Gold, Copper

PRODUCTION

85,000 ounces of gold and 13 million pounds of copper in 2011

Russdragmet - FLSmidth
57
InLine Leach Reactor
23
53.96
139.3

Russdragmet - FLSmidth

Mnogovershinnoe, Russia
September 2010

The Mnogovershinnoe mine is located 135km North from Nikolaevsk-on-Amur and 17km from the coast. The site was discovered in 1959 and detailed exploration began in 1963. Preliminary production began in 1991 and the mine has since produced over 2 million ounces of gold.

EQUIPMENT

InLine Leach Reactor ILR2000BA

MINERALS

Gold

PROCESSING

1,272,203 tonnes of ore for 2011

PRODUCTION

143,864 ounces of gold for 2012

Rudnik Matrosova - Polyus Gold
57
InLine Leach Reactor
23
61.6482
152

Rudnik Matrosova - Polyus Gold

Russia
November 2008

Rudnik Matrosova is located in the Magaden region of Russia. It is currently in its developmental stage and is estimated to produce approximately 500,000 ounces of gold annually.

EQUIPMENT

InLine Leach Reactor ILR100BA

MINERALS

Gold

Verninskoye - Polyus Gold
57
InLine Leach Reactor
23
57.897
114.2

Verninskoye - Polyus Gold

Russia
February 2011

The Verninskoye mine is located in the Irkutsk region of Eastern Siberia, in the historical gold mining area of Bodaybo. It is a conventional shovel-and-truck open-pit operation and is estimated to be the largest gold mine in Russia.

EQUIPMENT

2 x InLine Leach Reactor ILR1000BA & ILR1500BA

MINERALS

Gold

PRODUCTION

46,000 ounces of gold for 2012

Kangaroo Flat - Unity Mining
57
InLine Leach Reactor
23
-36.7
144.2

Kangaroo Flat - Unity Mining

Australia
January 2001

The Kangaroo Flat mine is the second largest goldfield in terms of historical production in Australia after Western Australia's Golden Mile. Opened 1993. The mine has been undergoing care and maintenance since 2011.

EQUIPMENT

InLine Leach Reactor 2000CA

MINERALS

Gold

Rosebery - MMG
57
InLine Leach Reactor
23
-41.7733
145.543

Rosebery - MMG

Australia
January 2001

The Rosebery mine is located in the township of Rosebery, on Tasmania's West Coast, 300 km North-West of Hobart and 125 km South of Burnie. It is an underground polymetallic base metal mine with surface processing operation.

EQUIPMENT

InLine Leach Reactor 100BA

MINERALS

Gold

PROCESSING

700,000 tonnes per year

PRODUCTION

8,695 ounces of gold during 2012

Henty - Unity Mining
57
InLine Leach Reactor
23
-41.8446
145.515

Henty - Unity Mining

Australia
January 1996

The Henty mine is an underground gold mine on the West Coast of Tasmania, 10km south of Rosebery. It is located in glaciated mountainous terrain in the Upper Henty Valley and is part of the Mr Read Volcanic Belt. The mine commenced operation in 1996.

EQUIPMENT

InLine Leach Reactor 100BM

MINERALS

Gold

PROCESSING

300 kilotonne per year

PRODUCTION

43,178 ounces of gold during 2010

3 Mile Hill - Focus Minerals
57
InLine Leach Reactor
23
-30.707
121.222

3 Mile Hill - Focus Minerals

Australia
January 2007

Focus Minerals is the largest landholder in the Coolgardie Gold belt with over 450sq km of tenements in close proximity to its 3 Mile Hill mine. It is located 35 km West of Kalgoorlie and is both open pit and underground.

EQUIPMENT

InLine Leach Reactor ILR150BA

MINERALS

Gold

PRODUCTION

90,000 ounces of gold during 2012

Ballarat Goldfields - LionGold
57
InLine Leach Reactor
23
-37.6
143.9

Ballarat Goldfields - LionGold

Australia
January 2003

The Ballarat mine is located 115 kilometres northwest of Melbourne. It is Victoria's second largest goldfield, based on historical production. It represents Castlemaine Goldfield's cornerstone asset and underground mining and ore processing at Ballarat was restarted in 2011.

EQUIPMENT

InLine Leach Reactor 10,000CA

MINERALS

Complex Gold

PROCESSING

263,000 tonnes per annum

PRODUCTION

71,700 ounces of gold in 2012

Tasiast - Kinross Gold Corporation
57
InLine Leach Reactor
23
20.6005
-15.4

Tasiast - Kinross Gold Corporation

Maruitania, Africa
January 2001

The Tasiast mine is an open pit operation located in north-western Mauritania and is approximately 300 kilometres north of the capital Nouakchott. Tasiast began commercial operations in 2008 and its processing includes milling, carbon-in-leach and heap leaching.

EQUIPMENT

InLine Leach Reactor ILR150BA

MINERALS

Gold

PRODUCTION

185,334 ounces of gold equivalent during 2012

Sadiola - IAMGOLD, AngloGold Ashanti
57
InLine Leach Reactor
23
13.8697
-11.6471

Sadiola - IAMGOLD, AngloGold Ashanti

Mali, Africa
January 2007

The Sadiola mine is located in the Kayes region of Mali. It is an open pit mine and conducts its processing through carbon-in-pulp & gravity separation. Its estimated mine life is at least 4 years.

EQUIPMENT

InLine Leach Reactor 3000BA

MINERALS

Gold

PRODUCTION

100,000 ounces of gold during 2012

Morila - Randgold Resources
57
InLine Leach Reactor
23
11.6812
-6.8468

Morila - Randgold Resources

Mali, Africa
April 2008

The Morila mine is situated 280 km South-East of Bamako, the capital of Mali. The mine has been in operation since February 2008 and was successfully converted from open pit mining to a stockpile treatment operation during 2009.

EQUIPMENT

InLine Leach Reactor ILR1000CA

MINERALS

Gold

Bonikro - Newcrest
57
InLine Leach Reactor
23
6.26616
-5.37781

Bonikro - Newcrest

Ivory Coast, Africa
November 2008

The Bonikro mine is located approximately 250km NW of the Ivory Coast's commercial capital, Abidjan. It is a conventional truck and excavator open pit mine. The predominant method of gold recovery is via carbon in leach tech, with some gold recovery via a gravity circuit.

EQUIPMENT

InLine Leach Reactor ILR150BA

MINERALS

Gold

PRODUCTION

90,350 ounces gold produced for the financial year ending 30 June 2013

Kloof - Sibanye Gold
57
InLine Leach Reactor
23
-26.3368
27.6

Kloof - Sibanye Gold

South Africa, Africa
July 2013

Situated between 60 and 70 km west of Johannesburg near the town of Westonaria in the Gauteng province of South Africa. Kloof in its current form dates from 2000 when it amalgamated with the Venterspost, Libanon, and Leeudoorn mines.

EQUIPMENT

InLine Leach Reactor ILR5000CA

MINERALS

Gold

PRODUCTION

7,883 ounces of gold for 2012

Tulawaka - African Barrick Gold
57
InLine Leach Reactor
23
-2.62927
31.3165

Tulawaka - African Barrick Gold

Tanzania, Africa
January 2002

The Tulawaka mine is located in North-West Tanzania in the Biharamulo district of the Kagera region and borders the Bukombe district of the Shinyanga region, South-West of Lake Victoria. The mine is currently in the process of being transferred to Stamico, the Tanzanian state mining company.

EQUIPMENT

InLine Leach Reactor 1000BA

MINERALS

Gold

South Deep - Gold Fields
57
InLine Leach Reactor
23
-26.3657
27.6044

South Deep - Gold Fields

South Africa, Africa
January 2002

The South Deep mine is located 45 km SW of Johannesburg. It consists of an intermediate deep level gold mine with two main shaft systems. The mining site area is 4,268 hectares and the ore is processed at a central metallurgical plant.

EQUIPMENT

InLine Leach Reactor ILR2000BA

MINERALS

Gold

PRODUCTION

270,000 ounces of gold in 2012

Bibiani - Noble Mineral Resources
57
InLine Leach Reactor
23
6.56093
-2.33459

Bibiani - Noble Mineral Resources

Ghana, Africa
January 2000

The Bibiani mine is located in western Ghana, 250km North-West of Accra. Commisioned in 1998, the open pit mine is located in the Sefwi-Bibiani Belt, which is host to over 17 million ounces of gold.

EQUIPMENT

InLine Leach Reactor 1000AC

MINERAL

Gold

Iduapriem - AngloGold Ashanti
57
InLine Leach Reactor
23
5.28515
-1.95282

Iduapriem - AngloGold Ashanti

Ghana, Africa
January 2002

The Iduapriem mine is situated in the Western region of Ghana, 70km north of the coastal city of Takoradi and 10km south-west of Tarkwa. It consists of the Insuapriem and Terebie operations. It is an open pit mine and its processing facilities include a carbon-in-pulp plant.

EQUIPMENT

InLine Leach Reactor ILR1000BA

MINERAL

Gold

PRODUCTION

180,000 ounces of gold for 2012

Obuasi - AngloGold Ashanti
57
InLine Leach Reactor
23
6.20199
-1.7

Obuasi - AngloGold Ashanti

Ghana, Africa
January 2001

The Obuasi mine is located in the Ashanti region of Southern Ghana, approximately 60km south of Kumasi. It is primarily an underground mine, operating at depths of up to 1500m, though some surface mining does occur.

EQUIPMENT

4 x InLine Leach Reactor ILR2000CA, ILR2000BA & ILR1000BA

MINERAL

Gold

PRODUCTION

280,000 ounces of gold for 2012

San José - Hochschild PLC
57
InLine Leach Reactor
23
-46.6
-70.8
San José - Hochschild PLC

San José - Hochschild PLC

Argentina, South America
May 2007

Title to the San Jose property is held by Minera Santa Cruz, S.A. ("MSC"), the holding and operating company set up under the terms of an option and Joint Venture Agreement between McEwen Mining Inc. (49%) and Hochschild Mining Argentina (51%), a wholly-owned subsidiary of Hochschild.

Equipment

8x InLine Leach Reactor ILR5000CA

Mineral

Gold and Silver

Processing

Plant capacity is 1,500 tonnes per day

Production

In 2012, total silver equivalent production at San Jose was11,099 koz, comprised of 5,953 koz of silver, and 85.77 koz of gold production.

Mina Casposo - Troy Resources
57
InLine Leach Reactor
23
-31.3161
-69.4308
Mina Casposo - Troy Resources

Mina Casposo - Troy Resources

Argentina, South America
December 2009

The Casposo operation comprises of an open pit, a new underground mine, currently under development and a processing plant.

Troy employs a total of 375 people, 67% reside in the District of Calingasta near the mine site, while the remaining employees mainly live in San Juan City and work on a rotational schedule. The operation currently employs 368 Contractors.

Equipment

InLine Leach Reactor ILR100BA

Mineral

Gold and silver

Processing

The plant has a nameplate throughput of 400,000tpa of ore

El Toqui - Nyrstar
57
InLine Leach Reactor
24
-45.5862
-72.0923
El Toqui Project

El Toqui - Nyrstar

Chile, South America
November 2008

The El Toqui mine is located 1,350 kilometres south of Santiago, Chile and 120 kilometres northeast of Coyhaique in a region with a well-known history of poly-metallic mineralisation. The El Toqui mine has been in operation since 1983 and has a long history of reserve replacement and promising exploration potential.

Equipment

InLine Leach Reactor ILR5000BA with integrated electrowinning and detoxification circuit.

Mineral

Zinc concentrate, lead concentrate, gold and silver as by-products

Processing

1,725 tonne per day processing plant

Production

20,000 tonnes of zinc in concentrate, 400 tonnes of lead in concentrate, 51,600 troy ounces of gold in concentrate, 113,000 troy ounces of silver in concentrate